Mini design project

Villa electrical design

Load list → demand → phase balancing → 20 circuits, MCBs, cables and RCDs → 63 A main board and SLD.

Teaching project. A complete preliminary design method with typical values — not a design to build from.

20final circuits
34.1 kVAmaximum demand (after demand factors)
51 Amost-loaded phase current
63 Amain incoming device (4-pole)

The brief

A two-storey villa with a majlis, kitchen, six bedrooms, laundry, outdoor lighting, a water pump and six split air-conditioning units. Supply is 230/400 V, three-phase, four-wire from the utility meter. Design the main distribution board: circuits, protective devices, cables, RCD protection and the incoming rating.

This is a teaching example. Demand factors, MCB ratings and cable sizes are typical starting points, not rules. The utility's requirements, the applicable wiring standard, cable manufacturer data and the local authority's rules govern a real design.

Step 1 — List every load

Each appliance group is a circuit. Air-conditioning units and water heaters get their own circuits because they run for long periods at full load.

Step 2 — Apply demand factors

Not every socket is used at full rating at the same time, but in a hot climate all AC units can run together, so they keep a demand factor of 1.0.

Demand kW = connected kW × demand factor
P = 32.3 kW Q = 10.9 kvar S = √(P² + Q²) = 34.1 kVA

Step 3 — Balance the phases

Circuits are allocated largest first to the least-loaded phase:

Phase loading after allocation (demand kVA)
PhaseDemand kVACurrent
L111.4149.6 A
L211.8451.5 A
L311.3649.4 A

Step 4 — Circuit schedule

Final circuits (typical values — verify for your standard and installation)
CircuitConnected kWDFDesign current IbMCBCableRCDPhase
Lighting — ground floor0.80.93.7 AB101.5 mm²—L3
Lighting — first floor0.80.93.7 AB101.5 mm²—L1
Lighting — outdoor0.51.02.3 AB101.5 mm²30 mAL2
Sockets — living / majlis2.00.49.2 AB162.5 mm²30 mAL2
Sockets — bedrooms GF2.00.49.2 AB162.5 mm²30 mAL3
Sockets — bedrooms FF2.00.49.2 AB162.5 mm²30 mAL2
Sockets — kitchen 13.00.513.7 AB204 mm²30 mAL3
Sockets — kitchen 23.00.513.7 AB204 mm²30 mAL1
Cooker7.00.630.4 AB326 mm²—L1
Laundry3.00.513.7 AB204 mm²30 mAL3
Water heater 11.50.76.5 AB162.5 mm²30 mAL1
Water heater 21.50.76.5 AB162.5 mm²30 mAL3
Water heater 31.50.76.5 AB162.5 mm²30 mAL1
Split AC unit 12.51.012.1 AC162.5 mm²—L2
Split AC unit 22.51.012.1 AC162.5 mm²—L3
Split AC unit 32.51.012.1 AC162.5 mm²—L2
Split AC unit 42.51.012.1 AC162.5 mm²—L3
Split AC unit 52.51.012.1 AC162.5 mm²—L1
Split AC unit 62.51.012.1 AC162.5 mm²—L2
Water pump1.11.05.6 AC102.5 mm²30 mAL2
Total44.7

Check each line: Ib ≤ In ≤ Iz for the actual installation method, voltage drop to the furthest point, and earth-fault loop impedance for the MCB curve. AC compressors and pumps use C-curve devices to ride through starting current.

Step 5 — Main incoming device and cable

The most-loaded phase carries about 51 A. Allowing about 15 % margin gives 59 A → 63 A main device (4-pole, isolating the neutral), with a surge protective device. The incoming cable must have Iz ≥ 63 A after derating, acceptable voltage drop over the actual route, and be coordinated with the utility's meter and cut-out rating.

Step 6 — Earthing and RCD protection

Villa protection checklist

0 / 6
Ticks are saved only in this browser. Adapt the list to the approved ITP and manufacturer instructions; it does not define acceptance criteria.
Single-line diagram of the example villa main distribution board (preliminary)
Figure 4.Single-line diagram of the example villa main distribution board (preliminary).

Try it yourself

Change the loads and rebuild the board in the SLD builder, size the cables with the cable sizing assistant and estimate quantities with the quantity estimator.