Interns & graduates
Your first 90 days on site.
A week-by-week plan for interns and new engineers: what to learn, which documents to read, what to ask — with checklists that save your progress.
Before day one
Read the job description again and list the systems you will work on — MV, LV, lighting, pumps, controls. Refresh three things you will use every day: reading a single-line diagram, how cable sizing works, and safe isolation. You do not need to know everything; you need to know how to find out and when to ask.
As an intern or new engineer you are never expected to switch, test or work on live equipment without authorisation, training and supervision. If someone asks you to, say you are not authorised — that answer protects you and them.
Weeks 1–2 — Learn the project and the people
Your goal is to understand what is being built, who is who, and how work is controlled.
Weeks 1–2
0 / 7Questions worth asking: Which drawings are the latest? Who approves materials? What is the inspection request process? Where are test records kept?
Weeks 3–4 — Learn the documents
Most site problems are document problems. Learn how these connect:
| Document | What it tells you | Learn more |
|---|---|---|
| Single-line diagram | The electrical structure and ratings | SLD guide |
| Cable schedule | Every cable: size, route, length, status | Templates |
| Material submittal | What was approved to be installed | Templates explained |
| Method statement | How the work will be done safely | Templates explained |
| ITP | What is inspected and tested, and when | Templates explained |
| RFI | Questions to the designer and their answers | Templates explained |
Weeks 3–4
0 / 5Weeks 5–8 — Own small scopes
Ask for a small, defined area — a floor's lighting, one plant room, a cable route — and own its progress under supervision.
Weeks 5–8
0 / 6Weeks 9–12 — Inspections and tests
Weeks 9–12
0 / 6Habits that make you stand out
Write it down
Notes, photos and dates protect you and the project.
Close the loop
Tell people when something they asked for is done.
Ask early
A question on day one costs nothing; a mistake after concrete costs a lot.
Check the revision
Before installing anything, confirm the drawing is current.
Be safe out loud
Stop work that looks unsafe — and say why.
Learn one thing a day
Use the formula sheet and solved problems.