Eighteen preliminary tools: the four original calculators, the Cable Circuit Analysis workbench, and thirteen interactive tools — including a load schedule builder, cable sizing assistant and short-circuit calculator — with live results, formulas, stated limits and printable reports.
All results are preliminary. They support understanding and early screening. Final selections require complete design checks — ratings, derating, short-circuit, protection coordination, earthing and authority requirements — using approved data and review by a qualified engineer.
The four calculators from the homepage, unchanged in function: voltage drop, three-phase power, transformer sizing and load current. The Engineering Design Studio workbench remains on the homepage.
ΔVCALCULATOR 01
Voltage drop calculator
Estimate voltage drop using cable resistance and reactance values supplied by the cable manufacturer.
Calculate apparent power and approximate active power from line voltage, current and power factor.
Enter values and calculate.
Uses S = √3 × V × I and P = S × PF. Assumes a balanced three-phase system and line-to-line voltage.
kVACALCULATOR 03 · NEW
Three-phase transformer sizing
Estimate a preliminary transformer rating from connected load, demand factor, power factor and future allowance.
Enter project load assumptions and calculate.
Preliminary estimate: required kVA = connected kW × demand factor ÷ PF × (1 + future allowance) ÷ target loading. The suggested rating is the next value in an indicative rating list, not a specification or final selection.
ACALCULATOR 04 · NEW
Electrical load current calculator
Calculate estimated line current from active power, system voltage and power factor for single-phase or balanced three-phase loads.
Enter load details and calculate.
Single-phase: I = P ÷ (V × PF). Balanced three-phase: I = P ÷ (√3 × V × PF). Uses active power in kW and line voltage. Assumes sinusoidal conditions and does not include efficiency unless reflected in the entered load/PF assumptions.