Road and street lighting combines lighting design, distribution engineering and civil coordination over kilometres of route. Most problems that appear after handover — dark sections, tripping circuits, failed drivers, leaning columns — can be traced to decisions or omissions during design review and installation.
What this department covers
- Lighting design inputs and outputs
- Luminaires, drivers and columns
- Feeder pillars, control and metering
- Circuit design and phase balancing
- Voltage drop and protection
- Installation and inspection
- Testing, commissioning and maintenance
01Lighting design inputs and outputs
The lighting design determines the luminaire type, wattage, optic, mounting height, spacing and arrangement needed to meet the specified lighting class for each road or area. Road lighting performance is commonly specified using criteria from recognised road lighting standards (for example the EN 13201 series or national equivalents) — such as average luminance or illuminance, uniformity, threshold increment (glare) and surround ratio — and the class for each road is assigned by the client or authority.
| Output | Electrical significance |
|---|---|
| Luminaire type, wattage and quantity | Circuit loading and number of circuits |
| Column height, outreach and spacing | Circuit route lengths and voltage drop |
| Arrangement (single-sided, staggered, opposite, central) | Cable routes and crossings |
| Control strategy (photocell, timer, dimming, CMS) | Pillar equipment and control wiring/communications |
| Maintenance factor assumptions | Ties performance to cleaning and lumen depreciation over time |
Electrical design should start from the approved lighting layout. A late change in column spacing or wattage changes circuit currents, voltage drop and sometimes cable sizes.
02Luminaires, drivers and columns
Modern street lighting uses LED luminaires with electronic drivers. Electrical review points include input power (including driver losses), power factor and harmonic performance, inrush current (which affects MCB selection and how many luminaires can share one device), surge protection, ingress protection (IP) and impact resistance (IK), and the class of electrical protection (Class I or Class II). Columns must suit the luminaire weight and wind loading, with foundation design to match.
| Parameter | Why it matters |
|---|---|
| System input power (W) | Basis for circuit current and energy |
| Power factor at full and dimmed output | Current and losses; PF can fall when dimmed |
| Inrush current and duration | MCB curve selection and luminaires per MCB |
| Surge protection level (kV) | Resilience to network and lightning surges |
| Class I / Class II | Determines earthing of the luminaire |
| IP / IK rating | Durability in the environment |
| Driver dimming interface | Compatibility with the control system |
03Feeder pillars, control and metering
The feeder pillar is the local distribution and control point. A typical pillar contains an incoming isolator or breaker, metering (where required by the utility), a contactor or controller switched by photocell, timer or central management system (CMS), outgoing protective devices, and surge protection. It must be earthed, ventilated, lockable and labelled.
04Circuit design and phase balancing
Lighting circuits are usually long, lightly loaded radial circuits looped in and out of each column. On three-phase circuits, columns are connected to phases in rotation — L1, L2, L3, L1… — so that the load is balanced and each phase's luminaires are spread along the route. The longest circuit is limited by voltage drop, by the earth-fault loop impedance needed for automatic disconnection, and by the protective device rating.
- Group luminaires into circuitsby route, load and maximum length.
- Allocate phasesin rotation and calculate current per phase.
- Select cable and protection: cable capacity ≥ device setting ≥ design current, with inrush considered.
- Check voltage dropat the last luminaire on each phase.
- Check earth-fault loop impedanceat the furthest point against the protective device's disconnection requirement.
- Check short-circuit and selectivitybetween the pillar device and the column cut-out fuse/MCB.
- Prepare the pole and circuit schedule— the Lighting Pole & Circuit Schedule template records this data.
Because the load is distributed along the route, the current in each cable section decreases towards the end of the circuit. Voltage drop is the sum over all sections:
05Installation and inspection
| Item | What to inspect |
|---|---|
| Foundation | Position and level, anchor bolt projection and orientation, concrete curing, grouting |
| Column | Verticality, finish undamaged, door orientation (usually away from traffic), numbering |
| Bracket & luminaire | Outreach and tilt per design, secure fixing, correct optic orientation |
| Base compartment | Cut-out correctly rated and fused/MCB, terminations tight, cable entries sealed, earth terminal connected |
| Cable route | Depth, ducts at crossings, warning tape, cable tags, loop-in/loop-out arrangement |
| Feeder pillar | Plinth, earthing, labelling, ventilation, lockability, schedule inside door |
06Testing, commissioning and maintenance
Testing typically includes continuity of conductors and protective conductors, insulation resistance of each circuit (with luminaire drivers disconnected or as the manufacturer permits), polarity, earth-fault loop impedance at the furthest point, RCD tests where fitted, functional tests of the control system (photocell/timer/CMS and dimming), and a night-time inspection to confirm every luminaire operates and aiming is correct. Some projects also require lighting performance measurements on site.
Insulation resistance test voltages can damage electronic drivers and surge protection devices. Follow the luminaire manufacturer's instructions — disconnect or isolate sensitive equipment as required by the test procedure.
07Troubleshooting
| Symptom | Likely causes | Checks |
|---|---|---|
| Whole circuit off at night | Contactor/controller fault, photocell failure, tripped device | Check control signal and contactor; inspect pillar device |
| MCB trips at switch-on | Combined inrush of many drivers | Compare inrush with MCB curve; split circuit or use suitable device/inrush limiter |
| Random luminaires failing | Surges, driver quality, water ingress | Inspect SPDs; check IP sealing and gland entries |
| Dim or flickering at end of circuit | Excessive voltage drop, loose neutral | Measure voltage at last pole under load; check terminations |
| RCD tripping in wet weather | Moisture in column bases or joints | IR test sections; inspect door seals and cable joints |
Street lighting circuit commissioning
0 / 10- Documents
- Inspection
- Tests
08Test yourself
Ten questions with explanations. Scores are saved only in your browser and feed your learning progress dashboard.