QA/QC field guide

Common site defects — wrong vs right.

12 installation defects that inspectors find again and again, each with an original illustration of the wrong and the right way, why it matters and what to check.

Cable bending radius too tight — wrong and right
01

Cable bending radius too tight

Why it matters: A tight bend at a panel or trench entry stresses insulation and, on MV cables, the semiconducting screen — a common origin of later failure.

What to check: Compare with the manufacturer's minimum bending radius for the installation stage and cable type; plan entry space before setting panels.

MV/LV Cables & Cable Jointing →
Armour not earthed at the gland — wrong and right
02

Armour not earthed at the gland

Why it matters: Unbonded armour can become live during a fault and may not provide the protective path the design assumes.

What to check: Check gland type matches the cable, earth tag fitted and connected to the earth bar, continuity tested.

MV/LV Cables & Cable Jointing →
Strands cut to fit an undersized lug — wrong and right
03

Strands cut to fit an undersized lug

Why it matters: Cutting strands reduces the conductor area at the termination, creating a hot joint.

What to check: Lug and die must match the conductor size and class; check crimp marks against the tool's die.

MV/LV Cables & Cable Jointing →
Exposed conductor between insulation and lug — wrong and right
04

Exposed conductor between insulation and lug

Why it matters: Bare conductor reduces clearances and creates a touch and flashover risk inside the enclosure.

What to check: Strip only to the barrel length; apply the specified sleeve and phase identification.

RMUs & Switchgear →
Cables without identification — wrong and right
05

Cables without identification

Why it matters: Untagged cables slow testing and fault finding and make isolation errors more likely.

What to check: Durable tags at both ends and at key points, matching the cable schedule and drawings.

Electrical Site Engineering & QA/QC →
Overfilled cable tray — wrong and right
06

Overfilled cable tray

Why it matters: Extra grouping and stacking reduce cable current ratings below the design values and make maintenance difficult.

What to check: Check fill and arrangement against the design grouping assumptions; add tray or re-route rather than stacking.

MV/LV Cables & Cable Jointing →
Multiple conductors under one earth bolt — wrong and right
07

Multiple conductors under one earth bolt

Why it matters: Connections loosen, conductors cannot be disconnected individually for testing, and identification is lost.

What to check: One lug per terminal unless the manufacturer allows otherwise; washers, torque and labels.

Earthing & Bonding →
Cable laid without bedding or warning tape — wrong and right
08

Cable laid without bedding or warning tape

Why it matters: Sharp stones damage the outer sheath over time, and missing tape removes the warning for future excavation.

What to check: Inspect bedding, cover, protection and tape against the approved trench detail before backfilling.

MV/LV Cables & Cable Jointing →
Unsealed cable entries and duct ends — wrong and right
09

Unsealed cable entries and duct ends

Why it matters: Open entries let in water, dust, sand and vermin — causes of tracking and flashover in panels and RMUs.

What to check: Seal duct ends and panel entries using the approved method after cable installation.

Electrical Site Engineering & QA/QC →
Panel door bonding jumper missing — wrong and right
10

Panel door bonding jumper missing

Why it matters: Doors carrying equipment can become live under fault without a reliable bond to the frame.

What to check: Flexible bonding conductor fitted and continuity tested as required by the panel design.

Earthing & Bonding →
Phase sequence changes between boards — wrong and right
11

Phase sequence changes between boards

Why it matters: Inconsistent phase identification leads to wrong phasing, motor reversal and errors during maintenance.

What to check: Keep identification and arrangement consistent; verify phase rotation before energising and phasing before paralleling.

MV & LV Distribution →
CT secondary left open — wrong and right
12

CT secondary left open

Why it matters: An open CT secondary on load produces dangerous voltages and can damage the CT.

What to check: Close the shorting link at the test terminal block before disconnecting any meter or relay.

Protection & Control →

Illustrations are simplified and not to scale. Acceptance criteria come from the approved drawings, specification, manufacturer instructions and the ITP for your project. Have a defect you would like added? Suggest it →