How to Prepare an Electrical Load Schedule

A practical structure for a traceable load list and demand assessment.

MV/LV Distribution

A practical structure for a traceable load list and demand assessment. This guide provides a structured field and engineering review framework. Apply the sequence to the approved scope and record project-specific requirements separately.

The load schedule feeds the LV distribution hierarchy and the rating of every protective device in it.
Figure.The load schedule feeds the LV distribution hierarchy and the rating of every protective device in it.

01Identify loads

Assign unique equipment tags and record description, quantity, phase, rated kW/kVA, voltage, power factor, efficiency and operating duty where available.

02Separate load concepts

Keep connected load, demand factor, maximum demand and spare capacity distinct. Document the source and rationale for each assumption.

03Group by distribution

Map each load to DB, SMDB, MDB, transformer and upstream source. Confirm phase allocation and identify essential, standby and life-safety loads.

04Calculate and review

Calculate current using the appropriate system formula and input assumptions. Review diversity, motor starting, harmonics, voltage drop and protective-device requirements separately.

05Control revisions

Record drawing references, revision, date, preparer, checker and approved changes. Reconcile the schedule with the SLD and equipment schedules.

Safety and compliance: This guide is educational. Follow approved procedures, permit systems, isolation requirements, competent-person controls and project acceptance criteria. It does not establish universal test limits or replace manufacturer instructions.