A material submittal demonstrates that a proposed product is suitable for the project requirements. The required documents vary by material, contract, consultant, client and authority. Always begin with the latest project procedure and specification.
01Recommended review sequence
- Confirm the requirement: identify the relevant specification clauses, approved drawings, schedules and material approval procedure.
- Identify the product: verify manufacturer, country of origin where specified, model, type, rating and accessories.
- Review technical data: compare each declared characteristic with the project requirement, not just the catalogue headline.
- Check evidence: review applicable certificates of conformity, type-test reports, routine/factory test certificates and authority approvals where required.
- Prepare compliance: use a clause-by-clause compliance sheet and mark each item compliant, deviation, or information required.
- Check document control: confirm revisions, dates, signatures, stamps, document references and traceability.
- Close comments: record missing information and obtain written supplier clarification before resubmission.
02Typical electrical submittal document groups
- Supplier/manufacturer details and product identification.
- Technical datasheets and catalogues with the offered model clearly identified.
- Compliance statement against project specifications.
- Relevant test certificates and reports for the exact product family/rating.
- Quality certificates, conformity documents and authority approvals where contractually required.
- Installation, operation and maintenance information where requested.
Do not assume: a generic certificate, brochure or previous project approval automatically proves compliance for the current project. Confirm scope, validity, model and ratings.