Worked example
LV sub-main cable selection
Ib ≤ In ≤ Iz, voltage drop and adiabatic check for a 180 A sub-main — with a candidate that fails.
Preliminary teaching example. Numbers show the method. They are not values to copy into a design.
The brief
A 4-core copper XLPE/SWA cable feeds an SMDB 150 m from the MDB, on a cable tray grouped with other circuits, in a hot plant room. Design current is 180 A at 400 V, PF 0.85. The MCCB at the MDB is set at 200 A. The prospective fault at the MDB is 20 kA, cleared in 0.2 s or less. The project allows 4 % voltage drop for this sub-main.
Cable ratings, R and X values below are illustrative numbers for teaching only. Always use the manufacturer's data for the actual cable and the rating tables and correction factors for the actual installation method.
Step 1 — Current-carrying capacity
I_b ≤ I_n ≤ I_z
Correction factors used: ambient C_a = 0.91, grouping C_g = 0.85, other C_i = 1.0. Combined factor = 0.773.
Step 2 — Voltage drop
For 120 mm²: ΔV = √3 × 180 × 0.15 × (0.196 × 0.85 + 0.072 × 0.527) = 9.56 V = 2.39 %.
Step 3 — Short-circuit withstand
Step 4 — Compare the candidates
| Size | It (table) | Iz | In ≤ Iz | ΔV | ≤ 4 % | S min | Fault |
|---|---|---|---|---|---|---|---|
| 95 mm² | 225 A | 174 A | ✗ Fail | 2.90 % | ✓ Pass | 63 mm² | ✓ Pass |
| 120 mm² | 260 A | 201 A | ✓ Pass | 2.39 % | ✓ Pass | 63 mm² | ✓ Pass |
The 95 mm² cable fails the overload check because grouping and ambient derating reduce its rating below the 200 A device setting. 120 mm² passes all three checks in this example — with little margin on Iz, so confirm the installation conditions before freezing the size.
Step 5 — Remaining checks
Complete before issuing the cable schedule