Worked example
1000 kVA substation sizing
Load schedule → transformer rating → LV current → fault level → main switchgear duty.
Preliminary teaching example. Numbers show the method. They are not values to copy into a design.
The brief
A small compound is supplied from a new 11/0.4 kV package substation. The task is a preliminary transformer size and LV main switchgear duty, so the design team can reserve space and start the utility application. The loads are taken from the architectural and MEP load schedules.
All demand factors, diversity and impedance values below are illustrative assumptions for teaching. On a real project they must come from the project design basis, utility rules and manufacturer data, and the result must be reviewed by the responsible engineer.
Step 1 — Load schedule
Demand kW = quantity × kW × demand factor. Reactive power is calculated from each load's power factor, and the totals are added as vectors.
| Load | Qty × kW | Connected kW | PF | Demand % | Demand kW | Demand kVA |
|---|---|---|---|---|---|---|
| Building A — lighting & small power | 1 × 120.0 | 120.0 | 0.92 | 70 | 84.0 | 91.3 |
| Building B — lighting & small power | 1 × 95.0 | 95.0 | 0.92 | 70 | 66.5 | 72.3 |
| HVAC chillers | 3 × 110.0 | 330.0 | 0.86 | 90 | 297.0 | 345.3 |
| Chilled-water pumps | 3 × 18.5 | 55.5 | 0.85 | 67 | 37.2 | 43.7 |
| Lifts | 2 × 22.0 | 44.0 | 0.80 | 50 | 22.0 | 27.5 |
| Street & external lighting | 1 × 28.0 | 28.0 | 0.95 | 100 | 28.0 | 29.5 |
| Fire pump (standby duty, excluded) | 1 × 55.0 | 55.0 | 0.85 | 0 | 0.0 | 0.0 |
The fire pump is listed but excluded from normal maximum demand because, in this example, the design basis treats it as a standby/emergency load with its own supply arrangement. That is a design decision that must be documented — not an assumption to copy.
S = √(P² + Q²) = 607.8 kVA
Step 2 — Diversity, spare and loading
An overall diversity of 90 % is applied between buildings, then 20 % spare for future load, and the transformer is sized to run at no more than 80 % at maximum demand.
S_req = 547.1 × 1.2 ÷ 0.8 = 821 kVA
The next standard rating in the project's preferred list is 1000 kVA. Check the result against the utility's standard sizes, the room/plot size and the transformer's loss class.
Step 3 — LV current and fault level
With an infinite source, I_sc ≈ I_n ÷ Z = 1,443 ÷ 0.06 = 24.1 kA. Including an assumed 250 MVA MV source and voltage factor c = 1.05 (IEC 60909-style), the prospective three-phase fault at the LV bus is about 23.6 kA.
| Item | Value |
|---|---|
| MV source fault level | 250 MVA (from utility — assumed here) |
| Transformer impedance | 6 % (from approved datasheet) |
| Transformer X/R | 8 (assumed) |
| Voltage factor c | 1.05 |
| Source reactance referred to LV | 0.67 mΩ |
| Transformer R + jX | 1.19 + j9.53 mΩ |
Step 4 — LV main switchgear duty
| Check | Requirement | Indicative selection |
|---|---|---|
| Incomer rated current | ≥ 1,443 A, temperature-derated for the room | 1600 A ACB (check derating curve) |
| Breaking capacity Icu | > 23.6 kA | 50 kA class device |
| Busbar short-time rating | ≥ prospective fault for protection clearing time | 50 kA for 1 s class (per assembly verification) |
| Protection | Selective with MV protection and outgoing devices | Electronic trip unit, settings by coordination study |
Step 5 — What is still open
Before this becomes a design