547 kVAmaximum demand after diversity
1000 kVAindicative transformer rating
1,443 Atransformer LV full-load current
23.6 kAprospective 3-phase fault at the LV bus

The brief

A small compound is supplied from a new 11/0.4 kV package substation. The task is a preliminary transformer size and LV main switchgear duty, so the design team can reserve space and start the utility application. The loads are taken from the architectural and MEP load schedules.

All demand factors, diversity and impedance values below are illustrative assumptions for teaching. On a real project they must come from the project design basis, utility rules and manufacturer data, and the result must be reviewed by the responsible engineer.

Step 1 — Load schedule

Demand kW = quantity × kW × demand factor. Reactive power is calculated from each load's power factor, and the totals are added as vectors.

Load schedule (illustrative)
LoadQty × kWConnected kWPFDemand %Demand kWDemand kVA
Building A — lighting & small power1 × 120.0120.00.927084.091.3
Building B — lighting & small power1 × 95.095.00.927066.572.3
HVAC chillers3 × 110.0330.00.8690297.0345.3
Chilled-water pumps3 × 18.555.50.856737.243.7
Lifts2 × 22.044.00.805022.027.5
Street & external lighting1 × 28.028.00.9510028.029.5
Fire pump (standby duty, excluded)1 × 55.055.00.8500.00.0

The fire pump is listed but excluded from normal maximum demand because, in this example, the design basis treats it as a standby/emergency load with its own supply arrangement. That is a design decision that must be documented — not an assumption to copy.

P = 534.7 kW Q = 289.1 kvar
S = √(P² + Q²) = 607.8 kVA

Step 2 — Diversity, spare and loading

An overall diversity of 90 % is applied between buildings, then 20 % spare for future load, and the transformer is sized to run at no more than 80 % at maximum demand.

S_req = S × 0.9 × (1 + 0.2) ÷ 0.8
S_req = 547.1 × 1.2 ÷ 0.8 = 821 kVA

The next standard rating in the project's preferred list is 1000 kVA. Check the result against the utility's standard sizes, the room/plot size and the transformer's loss class.

Step 3 — LV current and fault level

I_n = S ÷ (√3 × V) = 1000 000 ÷ (√3 × 400) = 1,443 A

With an infinite source, I_sc ≈ I_n ÷ Z = 1,443 ÷ 0.06 = 24.1 kA. Including an assumed 250 MVA MV source and voltage factor c = 1.05 (IEC 60909-style), the prospective three-phase fault at the LV bus is about 23.6 kA.

Inputs used for the fault level
ItemValue
MV source fault level250 MVA (from utility — assumed here)
Transformer impedance6 % (from approved datasheet)
Transformer X/R8 (assumed)
Voltage factor c1.05
Source reactance referred to LV0.67 mΩ
Transformer R + jX1.19 + j9.53 mΩ

Step 4 — LV main switchgear duty

Preliminary main switchgear selection
CheckRequirementIndicative selection
Incomer rated current≥ 1,443 A, temperature-derated for the room1600 A ACB (check derating curve)
Breaking capacity Icu> 23.6 kA50 kA class device
Busbar short-time rating≥ prospective fault for protection clearing time50 kA for 1 s class (per assembly verification)
ProtectionSelective with MV protection and outgoing devicesElectronic trip unit, settings by coordination study

Step 5 — What is still open

Before this becomes a design

0 / 0
    Ticks are saved only in this browser. Adapt the list to the approved ITP and manufacturer instructions; it does not define acceptance criteria.

    MV & LV Distribution department → · Calculator Centre → · All worked examples →

    You are offline — showing saved pages