A structured inspection framework for MV ring main units before energization. This guide provides a structured field and engineering review framework. Apply the sequence to the approved scope and record project-specific requirements separately.
01Documentation and ratings
Verify approved drawings, SLD, datasheet, rated voltage/current, short-time withstand, internal arc requirements where specified and operating philosophy.
02Visual and mechanical
Check enclosure condition, labels, mimic diagram, cable compartment, operating handles, pressure indicator where fitted, corrosion and cleanliness.
03Interlocks and earthing
Verify interlocks and earthing-switch indication using manufacturer-approved procedures. Never bypass interlocks or operate outside authorized switching rules.
04Electrical and control
Check cable termination, screen/earth connections, auxiliary supply, protection relay, CT wiring, trip/close circuits and remote/local controls.
05Testing and handover
Complete only the approved test scope, record instrument details and actual results, close defects and retain test sheets, settings and handover records.